Installing a Window Wall, French Doors, & Pass Through windows
The Owners of this Pennsylvania getaway wanted to make a statement with their new 2Fold Window Walls, Windows and Doors. Every opening was enlarged to accommodate a 2Fold® product that would do just that!
Due to the size of these six foot Pass-Through windows, the openings had to be customized larger than the previous window with even more stability placed into the framing.
Window Wall: Before
Installing 2Fold projects requires months of tedious planning and engineering. Even though our company boasts an 8-10 week turnaround time on your windows & doors, sometimes we outpace the client’s contractors. 2Fold does not shy away in the face of adversity. Instead, we bring extra supplies and materials to each installation so that we may see it through to the end. Even when we occasionally may have to do some extra work to correct the openings for our products to function properly. It’s all part of choosing our family for your 2Fold window walls, windows, & doors.
During
Construction on the premises made maneuvering through the house difficult with the installation of such large units. Luckily, there was sufficient outdoor space adjacent to our working areas and we made due.
After
As one of the larger jobs this home had, there were numerous openings for 2Fold® to fill. The contract for this job contained: x3 French Door systems, x2 Outswing doors, x2 5’x6′ Awning windows, and x2 Fixed windows. This home is still under major renovations but their new 2Fold Window wall, windows, and doors look amazing!